1viewlikescommentsshares
Fast read

The sixth Future Minerals Forum runs in Riyadh from 12 to 14 January 2027, hosted by Saudi Arabia’s Ministry of Industry and Mineral Resources, with this edition focused on finance and getting mining projects into production. This is a story about an exploration company that wanted investors to walk around its deposit on a touch table, and about keeping unpublished drill data safe on a stand where everyone wants a copy.

The first email arrived in late October, and its attachment would not open.

It came from the head of investor relations at a mineral exploration company in Riyadh. They had booked a meeting pod beside their stand at Future Minerals Forum, and they had a 3D model of their main deposit, built by their geology consultants. Every drill hole was in it. Every grade shell, shaded from cold blue at the edges to a deep orange at the core.

On the geologist’s workstation it looked wonderful. On anything else it would not load at all. The file was several gigabytes and needed software that costs more than most laptops.

“We want investors to walk around it,” she wrote. “Turn it and cut into it, the way our team does.”

Then came the second paragraph, the one that changed the project. Some of the drill results inside that model had not been published yet. The board planned to release them a few days before the forum opened. Until then nothing could leave the company. Not even a screenshot, and certainly not a file sitting on somebody’s cloud drive.

The model that said too much

We asked for a call with the geologist as well as investor relations. Everything that followed came out of that hour.

The raw model held everything the company knew, including holes that might never be announced. Putting that on a public stand was not a technology question. It was a disclosure question, and it belonged to their lawyers and their board, not to us.

So before anyone talked about screens, we agreed on what the screen was allowed to say. The geologist exported a lighter version containing only what would be public by the opening morning. We built two states into the experience: one for rehearsals, and one that matched the January release exactly. Only the client could switch between them.

Then we rebuilt the deposit as a real-time scene that a compact PC could run without strain. Investors would stand at a 55-inch touch table and drag one slider to slice down through the ground, layer by layer, watching the orange core appear beneath the surface rock. A second finger rotated the whole ore body. A tap on any drill hole showed its depth and its published result, and nothing else.

The machine ran with no network connection at all. Our builds are offline-first anyway, but here it did a second job. A table that is not online cannot leak anything online.

A range that ran backwards

Bilingual Arabic and English is standard on everything we deliver, and the chairman’s office would read the Arabic screens first. Three weeks before the show, a reviewer on the client’s side sent us a photo of the table with a red circle on it.

In the Arabic layout, a grade range had flipped. The numbers were correct, but the direction of the sentence had pulled the Latin units around them, so the lower figure appeared where the reader expected the higher one. A mining investor reading that would think of a different deposit.

We rewrote every unit in Arabic, locked each number so the layout could not move it, and asked the same reviewer to read every single screen again on the actual table, not on a laptop. She found two more, both in screens full of grams per tonne. A designer’s mock-up would never have shown them. Both were fixed before the end of that week.

Two days before the doors

On the Sunday before the forum, the investor relations head called just after Maghrib. The board had signed off the final release, and one resource figure had changed slightly from the draft.

A small change, on paper. But a number on a stand that disagrees with the company’s own announcement, in front of the people deciding whether to fund the next phase, is the kind of mistake that ends up in a meeting nobody wants to attend.

We had kept every figure in one simple sheet, separate from the 3D scene, for exactly this reason. The geologist edited the line. Investor relations approved it in writing. We loaded it, then checked every screen in both languages against the release, side by side. It took about an hour. Nobody had to touch the model.

The pod that got warm

Build day in the hall was cold enough for jackets. The pod was not.

For privacy, the stand builder had made it a closed room with a proper door. The PC lived in a cabinet under the table. After two hours of rehearsal with the door shut, our engineer noticed the slicing had started to stutter. The deposit hesitated each time someone dragged the slider, like a video on a weak connection.

He opened the cabinet and felt the air come out. The machine was protecting itself from its own heat by slowing down.

We carry spares, so the first fix took ten minutes. The spare unit went in while the first one cooled. The real fix took longer. We moved the PC out of the pod into the storage space behind it, ran the cables through the wall, and asked the stand builder to add a vent grille to the cabinet overnight. By morning the slicing was smooth again, and the pod no longer felt like a small kitchen.

“Can you just send me that?”

On the second day, a fund manager visiting from abroad spent a long time at the table. He sliced down to the deepest level, rotated the deposit twice, then turned to the youngest member of the investor relations team and asked if she could send him that exact view.

Her phone was already out of her pocket.

This was the moment we had planned for in October. The table had no export button, by design. What it had instead was a small option on the corner of the screen: “Send me the summary”. The visitor typed an email address, read a short consent line in Arabic or English, and ticked it. After the forum, the investor relations team sent him the public one-page fact sheet themselves, from their own system.

She pointed at it, visibly relieved. He used it.

People always want to take something away from a good stand. If you do not give them the right thing, they will ask for the wrong one, and a junior team member under pressure will want to say yes.

After the last meeting

On the final evening the hall emptied quickly. Carpet tiles were already being lifted two aisles away.

The investor relations head sat down in the pod with the door open and slid through the deposit on her own, slowly, top to bottom. It was the first time all week she had seen it the way her investors had, without talking over it.

Then she asked whether the same model could go on the boardroom wall back in Riyadh.

It could. The client owns the delivered assets. We packed the spare PC last.

This story is a composite drawn from common situations we see on stands and events in Bahrain and Saudi Arabia, not a single client project.

Buyer checklist for a Future Minerals Forum stand or meeting pod

  • Agree with your legal and investor relations teams what the screen may show before design starts.
  • Build from a reduced, public-only version of any geological model, never the raw file.
  • Run the experience offline, with no network connection on the machine.
  • Keep every figure in one editable sheet, separate from the 3D scene, so late changes take an hour, not a rebuild.
  • Check every on-screen number against your final release, in both languages, the day before opening.
  • Test Arabic layouts with units and ranges on the real display, read by a native speaker.
  • Ask where each computer sits inside closed pods, and how it is ventilated.
  • Give visitors an approved take-away with clear consent, so nobody improvises a file transfer.
  • Ask who from the supplier will be in the room, and which spares they bring.
Next step

Planning a presence at Future Minerals Forum?

If you want investors or delegations to explore a deposit, a facility or a project pipeline on your interactive exhibition stand, or you need a custom event application that keeps sensitive data on the device, tell us what you need to show and who needs to see it. Interactive stand builds typically take four to six weeks, so January planning starts now. A member of our team commissions and stands by every installation, on the ground in Saudi Arabia and Bahrain.

Start the conversationWhatsApp us+973 3557 7062

Or email info@faimglobal.com.

Related reading: interactive stands that prove Saudi localisation at iktva, how lead capture works on an exhibition stand and showing a machine you cannot ship.

Questions buyers ask

When is Future Minerals Forum 2027?

The sixth edition runs in Riyadh from 12 to 14 January 2027, hosted by the Ministry of Industry and Mineral Resources under the theme “Global Collaboration for Resilient Mineral Supply”. Check the official Future Minerals Forum website for the venue, exhibitor information and opening hours.

Is there still time to build an interactive stand for January?

Yes, if you start soon. Our interactive stand builds typically take four to six weeks, and our minimum build for one focused experience is five to ten working days from approval and advance payment. Leave time for your own legal and investor relations sign-off on content.

Can we show confidential geological data safely?

Show only what will be public on the day, built from a reduced version of your model. Our builds are offline-first, and an experience that never connects to a network cannot share anything through one. Your legal team should approve the final content.

Will the screens work in Arabic and English?

Yes. Bilingual Arabic and English delivery is standard across our interactive applications. Ask for every screen with numbers and units to be reviewed in Arabic on the real display before the show.

Can visitors take information away from the stand?

Yes, through a take-away you approve in advance, such as a public fact sheet sent after the event. Collect email addresses only with clear consent, since Saudi Arabia’s Personal Data Protection Law covers personal data collected from visitors, and have your legal team review the wording.

Will someone from FAIM be on site?

Yes. A member of FAIM commissions and stands by every installation we deliver, and we carry spares.

Sources

  1. Global Mining Review: Riyadh to host sixth edition of Future Minerals Forum in January 2027 (dates, host ministry, theme, focus on finance and project development)
  2. TradeArabia: Riyadh to host sixth edition of FMF in January 2027 (dates and organiser, citing the Saudi Press Agency)
  3. Future Minerals Forum: Country pavilions (role of pavilions at the forum)
  4. Clyde & Co: Saudi Arabia issues Personal Data Protection Law (personal data rules in Saudi Arabia)

Found this useful?

Comment

Leave a Reply

Your avatar (pick a colour or add a photo)

WhatsApp us Book a Demo